BulkDeskDocs Open BulkDesk

Jobs

Jobs as a board or a list, leads, closed jobs, and every tab inside a job.

Jobs, Leads and Closed

  • Jobs shows every job by stage. Board and List switch between stage columns and a table grouped by stage with client, holder, days in the stage, progress bars, late count, finish date and contract. Click a group heading to fold it. Board opens first; BulkDesk remembers the one you last used on that device.
  • Leads (office only) holds every request from a client until it is won or lost. See Boards.
  • Closed is the archive of finished jobs, with a search.

Jump to any job from the top bar by number, name or address (Ctrl K).

Inside a job

TabWhat it is forWho uses it most
BoardEvery activity in groups, with responsibles, trade, dates and status. Click a row to open its card, comment and @mentionSite Manager
KanbanThe same activities as cards by status. Drag a card to change itSite Manager
ProgramPlan against actual on one sheet: dashed is the original plan, yellow is today, then This week on site and Needs a decisionPlanning
DocumentsDrawings, specifications, permits, safety documents and photosEveryone on the job
On siteThe gate QR poster and who is on site right nowSite Manager
DiaryOne page a day: weather, work done, deliveries, delays, notes. Save as draft, then signSite Manager
SafetySWMS and inductions people sign before the gate lets them inSite Manager
EstimateThe BOQ: sections, lines, margins, client price. Site notes become a draft BOQ herePlanning, Finance
MaterialsThe order list from the estimate: ordered, delivered and what was paidPlanning, Site Manager
CostsWhat the job has cost against the BOQ budgetFinance, Planning
VariationsChanges to the contractEveryone running the job
BillingProgress claims against the contractFinance
ReportsPDFs to print or sendAll three profiles

Site roles never see prices: Estimate, Costs and Billing are office only, and documents marked "has prices" are left out by the server.

Progress bars

Each job shows Program (the average percent of its activities), Materials delivered and, for the office, Budget spent and Claimed. A solid bar is progress; a striped bar has passed its limit. Whoever runs an activity sets its percent: 0, 10, 25, 50, 75, 90 or 100.

The diary

After a day is signed, changes are kept as corrections with a reason. Signed by mistake? Use Signed by mistake? on that day; it needs a manager unless you are one.

Job documents

Added by the office and the Site Manager. Tick has prices on anything with money in it: only the office sees those. A document opens in a box over the page with Download, Share and Open full screen, never in a new tab.